This was the first project of my carrier. This project was based on the theme that many times, due to the manual faults the railway crossing remains open during the train arrival and due to such kind of mistakes severe accident occurs. To avoid these problems we have the concept of ‘Automated Railway Crossing System’.
The basic concept behind this project was to use Infra Red Sensors (Transmitter and Reciever)and the moost common IC 555(usually called as Timer IC). This project won the first prize in our school fair and this success gave boost to opt for Engineering.
For the Circuit and other details you may contact the author.
Wednesday, August 1, 2007
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment